Production Equipment / Production Facilities£¼  HOME

  Installed outdoors and traveling on the rail, it carries block, materials and other production equipment during and after fabrication.

  Installed indoors, it also carries block, materials and other production equip- ment during and after fabrication.

  Theses are 250 ton capacity of cater- pillar type. Maximum lift is 62 meters. Usually used for the flip over of deck- house floor. 3 units are deployed in our shop.

  Tower Crane located in front of pre-assembly shop is used to transfer the pre-outfitting. The feature is large working radius.

  Selected for the operation of the dedic- ated block fabrication shop, T-car is arr- ayed in the flowing production system. It lifts and moves a deckhouse floor, T-Bhd, and Bhd shell to the working area.

  Placed in the cutting shop, it cuts the steel plates in accordance with a nest- ing program. Two conventional types and one NC type cutting machines are in operation.

  By exerting hydraulic force, and its resultant plastic formation, this machine bends and shears the steel plates.
  In our shop, this machine is used for the forming work of fore and after blocks.  Three units of 1,500 ton, 1,000 ton, and 250 ton respectively are in operation.

  300Ton Gantray Crane is used to assemble the huge block for P.E(Pre-Erection) and turn over the block. It is very important equipment for production type of Dock.